1) The metal surface will be sanded down to remove loose dirt, dust, loose primer coated or oil from the surface.
2) Then single coat of UGAM F R PRIMER EP for intumescent coatings will be applied to the surface after mixing base with hardener in 4:1 ratio and with roller.
3) After curing of minimum eight hours, first coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
4) After curing of minimum eight hours, second coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
5) After curing of minimum eight hours, third coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
6) After curing of minimum eight hours, fourth coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
7) After curing of minimum eight hours, fifth coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
8) After curing of minimum eight hours, sixth coat of UGAMCOAT 141098 EP will be applied with the help of roller again after mixing of base with hardener in 4:1 proportion.
9) After curing of 12 hours, the DFT will be checked and further coats requirement will be decided if require.
10) After minimum 12 hours of application of last coat as above, first coat of UGAM P U F R topcoat will be applied with help of roller after mixing base with hardener in 4:1 proportion.
11) Finally after minimum 8 hours of application, second coat of UGAM P U F R topcoat will be applied with help of roller after mixing base with hardener in 4:1 proportion.
12) The surface will be ready to take in use after 24 hours of application of final coat.
13) The final dry film thickness will be around 1800 microns for 2 hours fire rating.
CLIENT NAME |
CLIENT NAME |
Anandrishiji Hospital & Medical Research Center |
Steel Strips Wheels Ltd. |
ITC Hotel Hyderabad |
Bharat Forge Ltd |
Elpro Estates Ltd. |
Bengal DCL Housing Development Company Ltd. |
Volkswagen India Ltd. |
Barclays Technology Center |
Goel Ganga Developers |
B P C L and H P C L for all India depots |
Defense land systems India |
Gravity Chemicals |
Phoenix Mall |
O N G C - for offshore and onshore |
New P C N D T buildings |
C-Net Solution |
Playboy cafe |
Kokal Interior Contracts Pvt Ltd |
K P M G Ltd |
Tube Products India Ltd |
Mahindra and Mahindra Ltd |
Aquapharm Chemicals Pvt. Ltd |
ENH Interior Projects – Manikchand Icon |
Rank Cranes |
VerGo Pharma Research Laboratories Pvt. Ltd. |
Innvenue Hospitality Management Pvt Ltd. - Ishanya Mall |
S R Enterprises |
Rahi Systems |
Madhav Enterprise |
Eclat Engineers |
Industrial Electric Services |
Pinks Engineers |
York India Ltd, Chakan |
Pressure Vessels (India), Pune |
Quantum Ltd., Mumbai |
Capricorn Plaza Pvt. Ltd., Mumbai |
Shree Sastha Enterprises |
Windsor Realty Pvt. Ltd., Santacruz |
Air Liquide Medical System Pvt. Ltd. |
PMT Machines Ltd, Pune |
Nand-Neel Engineering Services |
Machino Autocomp Ltd., Pune |
Thirumalia Chemicals Ltd., Tamil Nadu |
Naveen Electricals, Karnataka |
Transfix India, Pune |
Rattan Singh Buildtech Pvt. Ltd., New Delhi |
Aim Filtertech Pvt. Ltd. Pune |
MultiMetals Ltd |
Phadnis Infrastructure Ltd., Pune |
Conserve Consultant & Engineers |
M/s Thermal Systems (Hyderabad) Pvt. Ltd. |
S.S. INSULATION |
Varad Enterprises - Kalyani Global |
ITC Hotel Kolkata |
Shachi Engineering Pvt. Ltd |
Chanda Interiors, Bangalore |
Zelos Developers (P) Ltd. |
Mathew Associates Hook-Up & Weld Services |
Multi Amp Enginners Pvt. Ltd |
Geographics Interiors Pvt. Ltd. |
IAV India Pvt. Ltd. |
Kiyosh Electronics |
Thoughtful Theme Creations Pvt. Ltd |
Accutech Power Solutions Pvt. Ltd |
Alpha Foan Ltd, Pune |
Pinnac Housing Pvt. Ltd., Pune |
Mittal Developers
|
Vaibhav Electricals |
Natco Products India Pvt. Ltd.
|
Micron Electricals, Bangalore |
The technical specification is correct to the best of our knowledge and under test conditions and we do not accept any liability towards misuse and contents of it. Product must be tested for specific use prior to use.